Smart plaster UNIVERSAL
For mounting, installation and restoration works
-
The material does not slide down along vertical surfaces
-
No shrinkage or deformation
-
Fast mounting and installation
In stock How to buy About delivery
The recommended retail price (including VAT excluding delivery) is provided for reference and is not a public offer.
- Versatility
- Possibility of thick-layer leveling and thin-layer processing of the base
- The material does not slide down along vertical surfaces
- No shrinkage or deformation
- High adhesion
- Fast mounting and installation
- For installation works and final leveling
Recommended for sealing GWB (gypsum wall board) and GFS (gypsum-fiber sheet) joints using reinforcing tape, fixing GWB (gypsum wall board) and GFS (gypsum-fiber sheet) defects, as well as for repairing shallow chips, dents, cracks, scratches and other damage to bases and for creating decorative textured surfaces: can be used for thick-layer and thin-layer base processing of the interior of residential and public premises with a moderate level of humidity.
Concrete, cellular concrete (foam and aerated concrete), brick, gypsum and cement plaster, TGPB (tongue-and-groove partition blocks), GWB (gypsum wall boards), GFS (gypsum-fiber sheets) can be used as a base;
The base must be dry, solid, free from dust, dirt, oils, paint, residue of chalk and lime mortars. To increase the strength of adhesion of the material to the base, it is necessary to treat the surface with one or two layers of a deep penetration primer, while uneven and highly absorbent bases should be covered in several layers. Dust pollution of primed surfaces should be prevented. In the room where the works are carried out, draughts and direct sunlight should be avoided. While the works are carried out, the temperature in the room should be not lower than +5°С.
To prepare the mortar, only clean containers, tools and water should be used. It is forbidden to introduce any additional components to the prepared mortar. To prepare the mortar, pour the contents of the bag into a container with clean water
(0.6-0.65 L per 1 kg of dry mix) and stir for 2 minutes until smooth. Let the mortar settle for 5 minutes and stir it again. Stirring is performed mechanically using a professional mixer or an electric drill with a mixing paddle. Manual mixing is allowed when the weight of mix to be added to water does not exceed 1 kg. The prepared portion of the mortar must be used up within 40 minutes of work; it is necessary to additionally stir the mixed mortar without adding any water.
Apply the mixed mortar of the Universal Smart Gypsum Plaster in portions (one trowel) along the sheet in one row in its center with an interval of 35 cm around the perimeter with a minimum interval. Press the panel to be installed tightly against the base and with light taps, using a rail, set it in a single facing plane. The position of panels can be adjusted within 10 minutes after applying the Universal Smart Gypsum Plaster mortar mixture. When mounting mineral wool slabs, it is necessary to first trowel the entire surface of the slab with a thin layer of the Universal Smart Gypsum Plaster mortar. While applying the Universal Smart Gypsum Plaster mortar to the surface of GWB (gypsum wall boards), GFS (gypsum-fiber sheets), gypsum panels, decorative elements and insulating materials, it is forbidden to add water or dry mix to the mortar!
When installing TGPB (tongue-and-groove partition blocks), the Universal Smart Gypsum Plaster mortar is applied into the groove of the bottom row of blocks and into the vertical end groove. Any excess mortar is immediately removed for future use. Once the installation of the partition block is complete, the surface irregularities are sanded or filled with putty.
First, fill in dents, cracks and surface irregularities, then apply the primary layer of the material on the surface to be treated, and level it with a steel trowel. Holding the trowel at an angle to the base while applying strong pressure, carefully spread the mortar over the surface with vertical or horizontal movements until the desired layer is achieved. If necessary, the mixture can be applied in several layers. Before applying the next layer, the surface of the completely dried previous layer should be primed. During the drying process, do not use forced drying of the treated surface. To achieve a smooth surface, grinding is not required, but if necessary, it is ground with “zero grit” sandpaper, a grater or other grinding tool.
Once all the works are finished, the tools should be immediately washed with water.
Mix characteristics | Value | |
Color |
White (color variations are possible) |
|
Base temperature |
from +5°С to +30°С |
|
Water ratio per 1 kg of dry mix |
0.6-0.65 L/kg |
|
Initial setting time of the mortar mixture |
not earlier than 40 minutes |
|
Strength of adhesion to base |
NLT 0.3 MPa |
|
Flexural strength |
NLT 1.2 MPa |
|
Compressive strength |
NLT 3.0 MPa |
|
Material consumption during installation of 1 m² of wall surface |
1.0-2.0 kg/m² |
Mix characteristics | Value | |
Color |
White (color variations are possible) |
|
Base temperature |
from +5°С to +30°С |
|
Water ratio per 1 kg of dry mix |
0.6-0.65 L/kg |
|
Initial setting time of the mortar mixture |
not earlier than 40 minutes |
|
Strength of adhesion to base |
NLT 0.3 MPa |
|
Flexural strength |
NLT 1.2 MPa |
|
Compressive strength |
NLT 3.0 MPa |
|
Material consumption during installation of 1 m² of wall surface |
1.0-2.0 kg/m² |
You can select and send the order to the points of sale closest to you.
Important! partner prices differ from those indicated on the site.
When ordering directly from us, the products will be shipped from the central warehouse in Samara.
Market "STROYDOM"
Samara
Market "Samodelkin"
Samara
Market "at the bird"
Samara
Market "On Elizarova"
Samara
LLC "Stroymash"
Samara
"PKF" Flag Stone Art "
Samara
LLC "Nick"
Samara
LLC "square meters"
Samara
Ltd. "Ekogips"
Samara
Shipping options:
Maritime cargo shipping
Containers, Barge
Rail freight shipping
Container, Covered railroad car, Gondola car, Covered hopper
Road shipping
Containers, Trucks, Bulk cement trucks
PEC
Shipping of small loads (Bag, Pallet of gypsum plaster) by a transport company
Pick-up
Any transport or logistics company of your choice.
Payment options:
Cashless settlement
bank transfer - any method of invoice payment
Cash settlement
in a retail store - by pick-up (only for individuals)
If you are ready to purchase more than 10 tons at once, when contacting us via the feedback form or by calling the phone number8 800 500 70 63 you are assigned a personal manager who will develop a personalized profitable quotation for you!
Bulk order placement process:
Request
Send us an email with a request for product delivery
Quotation
You will receive a quotation with the maximum discount by email
Confirmation
Confirm the order, and we will promptly transfer it to processing
Payment
Mutual approval of the terms and conditions of sale and delivery
Order picking
We promptly pick your order
Shipping
We ship the cargo according to the agreed delivery method
Make order
You can see detailed information on the page terms of partnership agreements .
It is interesting and profitable to work with us!