Samara
0
RU EN
  /  
  /  
  /  
SUPERFIX FACADE

Cement glue Superfix facade

Smart gypsum plaster

  • Structural cement adhesive for fixing decorative elements on the facade of the building. 

  • Heat-resistant – suitable for fireplaces

  • Moisture-resistant – suitable for swimming pools

Not available How to buy About delivery

25 kg

The recommended retail price (including VAT excluding delivery) is provided for reference and is not a public offer.

Description
Advantages
  • High-plasticity
  • Thermostable and heat-resistant – facing of stoves and fireplaces
  • For areas with high traffic
Scope of Application
  • porcelain stoneware slabs

  • porcelain tiles 

  • natural and artificial stone 

  • clinker tiles 

It is used for interior and exterior works during wall and floor facing in residential, administrative and industrial premises: 

  • apartments

  • retail stores

  • facade cladding

  • balconies

  • terraces 

  • plinth walls and swimming pools. 


For facing of heated surfaces: 

  • underfloor heating systems

  • stoves and fireplaces (up to +120°C). 


Also suitable for spot bonding of insulating materials such as expanded polystyrene foam and mineral wool, cement-bonded particle board, sound insulation panels, etc.

Bases

It is used on non-deformable and deformable rigid bases: 

  • sand-cement bonding plaster

  • lime-cement and gypsum bonding plasters

  • cement mortar screeds

  • precast and cast-in-place concrete (with an age of at least 60 days.)

  • cellular concrete

  • gas silicate blocks

  • TGPB (tongue-and-groove partition blocks), GWB (gypsum wall boards), GFS (gypsum-fiber sheets), OSB (oriented strand boards), CBPB (cement-bonded particle board)

  • old strong facing coatings 

  • painted surfaces, provided that the paint has a strong adhesion to the base. 

Preparation for Work

The base should be:

  • dry

  • solid

  • free from dust, dirt, oils, paint, residue of chalk and lime mortars. 

Cement bases should not be liable to shrinkage after the mounting of the facing material, thus the plaster should be cured for at least 7 days per 1 cm of thickness, and cement-based screeds should be cured for at least 28 days

Bases that have been heated by the direct sunlight need to be moistened with water to cool them down

To increase the strength of adhesion of the material to the base, it is necessary to treat the surface with one or two layers of a deep penetration primer, while uneven and highly absorbent bases should be covered in several layers. 

Dust pollution of primed surfaces should be prevented. Facing is carried out only after the primed base is completely dried through

In the room where the works are carried out, draughts and direct sunlight should be avoided. Gypsum bases should be completely dry (with maximum residual moisture content of 0.5%), sufficiently solid, and dust-free.

Mortar Preparation

To prepare the mortar, only clean containers, tools and water should be used. 

It is forbidden to introduce any additional components to the prepared mortar. 

To prepare the mortar, pour the contents of the bag into a container with clean water (0.19-0.23 L per 1 kg of dry mix) and stir for 2-4 minutes until smooth. 

Let the mortar settle for 5 minutes and stir it again

Stirring is performed mechanically using a professional mixer or an electric drill with a mixing paddle. 

Manual mixing is allowed when the weight of mix to be added to water does not exceed 1 kg. 

;

The adhesive mixture is applied to the base using a notched trowel with tooth size not less than 8 mm

The trowel should be selected in such a way so that, for interior walls and floors with light load, 65-70% of the back side of the tile could be covered with adhesive, and for surfaces with heavy load or when laying the tiles outdoors, 100% of the tile could be covered.

To ensure high adhesion, a thin layer is first applied to the base with the smooth side of the trowel. 

Immediately after this, a layer with the required thickness is applied using an appropriate notched trowel, depending on the type and size of the tile

For exterior floor and wall cladding, the adhesive is applied to both the base and the back side of the cladding material (double application) to ensure its installation without hollows.

Application

If the back side of the cladding material is thickly covered with dust, it is recommended to moisten this side with water

For best adhesion, the facing material needs to be installed with some pressure applied

Under normal temperatureand humidity conditions, the open time is about 25 minutes

Unfavorable weather conditions

  • bright sunlight

  • dry wind

  • high temperature, etc.

  • or a highly absorbent base

can reduce the open time to a few minutes.

During the first 24 hours, it is forbidden to wash the installed cladding material or leave it in the rain, and it is also necessary to protect it from freezing and bright sunlight for 7 days. 

;

The position of the tiles can be adjusted within the first 20 minutes.

Tile grout is applied after 24 hours

when facing floors (with a 6x6 mm trowel), after 8 hours when facing walls (with a 3x3 mm trowel). 

When facing floors (with a 6x6 mm trowel), walking on tiles is possible 24 hours after laying. 

Underfloor heating can be used not earlier than 28 days after cladding. There must be no hollows in the adhesive layer under the tiles. Expansion joints must be filled with appropriate sealants. For spot bonding of sound-proof or heat-insulating panels, the adhesive mixture should be applied in single spots or with a trowel.

Installation of Facing Material

If there is a strong dustiness on the back side of the facing material , it is recommended to moisten this side

For the best adhesion, the lining material must be laid with pressure

At normal temperature and humidity, the open time is about 25 minutes

Unfavorable climatic conditions

  • bright sun

  • dry wind

  • high temperatures, etc

  • or a highly absorbent base

can reduce the open time to a few minutes.

The glued facing material is not allowed to be washed or left in the rain for the first day, and it is also necessary to protect it from freezing and strong sun for 7 days. 

Joint Sealing and Filling

The tile position can be adjusted within 20 minutes.

Grout - after 24 hours

when facing floors (with a 6x6 mm spatula), after 8 hours when facing walls (with a 3x3 mm spatula). 

When facing floors (with a 6x6 mm spatula), walking is possible 24 hours after laying the tiles. 

Operation of the "Underfloor heating" - not earlier than 28 days after facing. The presence of voids in the glue layer under the tile is not allowed. Expansion joints should be filled with appropriate sealants. For spot gluing of sound-proof or heat-insulating panels, the adhesive mixture is applied point-by-point or with a spatula.

Technical Characteristics
Mix characteristics Value
Color gray (color variations are possible)

Work performance temperature

from +5ºС to +30ºС

Water amount

per 25 kg of dry mix – 4.75 - 5.75 L

Layer thickness

2-10 mm

Consumption at a layer of 1 mm

1.1 - 1.25 kg/m²

Mortar working life

NLT 4 hours

Tile laying time

25 min

Adjustment time for tiles with water absorption less than 0.5%

60 min

Time before walking (6x6 mm trowel)

NLT 24 hours

Adhesion strength in the air-dry environment

NLT 1.5 MPa

Adhesion strength in the water environment

NLT 1 MPa

Adhesion strength after cyclic freezing-thawing

NLT 1 MPa

Operating temperature

from -60ºС to +120ºС

Where to buy

You can select and send the order to the points of sale closest to you.

Important! partner prices differ from those indicated on the site.


When ordering directly from us, the products will be shipped from the central warehouse in Samara.

Partners and points of sale
Show in list Show on map

Market "STROYDOM"

Samara

Krupskaya Street, 1

Market "Samodelkin"

Samara

Street Tashkenskaya / etc. Karl Marx, 15, MKP

Market "at the bird"

Samara

Novo-Vokzalnaya street, 2A

Market "On Elizarova"

Samara

Victory Street / street Elizarova

LLC "StroyTreyd"

Samara

Olympic Street, 67

LLC "Stroymash"

Samara

Gubanov street, 3, office 408, 4th floor

LLC "STROYALYANS"

Samara

LLC "STROYALYANS"

Samara

OOO "Samara Center of building materials"

Samara

Moscow highway, 15

LLC "Nick"

Samara

Zaparojye street, 19, section №213, warehouse №31, 32 (TC "Ant")

LLC "square meters"

Samara

LLC "square meters"

Samara

town of Volzhsky, Gorky Street, 18

LLC "square meters"

Samara

Moscow highway, letter D (AT "The Rock")

OOO "Leroy Merlin Vostok"

Samara

LLC "AlfaStroy"

Samara

Ltd. "Yunident-Volga"

Samara

Ltd. "Ekogips"

Samara

Street Party Congress 22, 1c (the territory of the base Samaravtortsvetmet)
Selected for order:

Choose products
Payment/Delivery
Shipping options:

Maritime cargo shipping

Containers, Barge

Rail freight shipping

Container, Covered railroad car, Gondola car, Covered hopper

Road shipping

Containers, Trucks, Bulk cement trucks

PEC

Shipping of small loads (Bag, Pallet of gypsum plaster) by a transport company

Pick-up

Any transport or logistics company of your choice.

Payment options:

Cashless settlement

bank transfer - any method of invoice payment

Cash settlement

in a retail store - by pick-up (only for individuals)

Wholesalers
If you are ready to purchase more than 10 tons at once, when contacting us via the feedback form or by calling the phone number8 800 500 70 63 you are assigned a personal manager who will develop a personalized profitable quotation for you!
Bulk order placement process:
1

Request

Send us an email with a request for product delivery

2

Quotation

You will receive a quotation with the maximum discount by email

3

Confirmation

Confirm the order, and we will promptly transfer it to processing

4

Payment

Mutual approval of the terms and conditions of sale and delivery

5

Order picking

We promptly pick your order

6

Shipping

We ship the cargo according to the agreed delivery method

Reviews (0)

Make order

You can see detailed information on the page terms of partnership agreements .
It is interesting and profitable to work with us!

By clicking Submit button, I give consent to the storage and processing of my personal data.

Thank you! Your feedback has been successfully submitted.

Our manager will contact you shortly, thank you for waiting.

Location:

Samara, Russia
or choose another

Ask a Question

By clicking Submit button, I give consent to the storage and processing of my personal data.

Thank you! Your feedback has been successfully submitted.

Our manager will contact you shortly, thank you for waiting.

New opinion

By clicking "Send", I consent to the storage and processing of my personal data.

Thanks! Your review has been sent successfully.

Our manager will contact you shortly, please wait.

Make order

By clicking Submit button, I give consent to the storage and processing of my personal data.

Thank you! Your feedback has been successfully submitted.

Our manager will contact you shortly, thank you for waiting.

COMPLAINTS FORM

Select date in calendar
By clicking Submit button, I give consent to the storage and processing of my personal data.

Thank you! Your application form has been successfully submitted.

Our manager will contact you shortly, thank you for waiting.