Cement glue Superfix facade
-
Structural cement adhesive for fixing decorative elements on the facade of the building.
-
Heat-resistant – suitable for fireplaces
-
Moisture-resistant – suitable for swimming pools
Not available How to buy About delivery
The recommended retail price (including VAT excluding delivery) is provided for reference and is not a public offer.
- High-plasticity
- Thermostable and heat-resistant – facing of stoves and fireplaces
- For areas with high traffic
-
porcelain stoneware slabs
-
porcelain tiles
-
natural and artificial stone
-
clinker tiles
It is used for interior and exterior works during wall and floor facing in residential, administrative and industrial premises:
-
apartments
-
retail stores
-
facade cladding
-
balconies
-
terraces
-
plinth walls and swimming pools.
For facing of heated surfaces:
-
underfloor heating systems
-
stoves and fireplaces (up to +120°C).
Also suitable for spot bonding of insulating materials such as expanded polystyrene foam and mineral wool, cement-bonded particle board, sound insulation panels, etc.
It is used on non-deformable and deformable rigid bases:
-
sand-cement bonding plaster
-
lime-cement and gypsum bonding plasters
-
cement mortar screeds
-
precast and cast-in-place concrete (with an age of at least 60 days.)
-
cellular concrete
-
gas silicate blocks
-
TGPB (tongue-and-groove partition blocks), GWB (gypsum wall boards), GFS (gypsum-fiber sheets), OSB (oriented strand boards), CBPB (cement-bonded particle board)
-
old strong facing coatings
-
painted surfaces, provided that the paint has a strong adhesion to the base.
The base should be:
-
dry
-
solid
-
free from dust, dirt, oils, paint, residue of chalk and lime mortars.
Cement bases should not be liable to shrinkage after the mounting of the facing material, thus the plaster should be cured for at least 7 days per 1 cm of thickness, and cement-based screeds should be cured for at least 28 days.
Bases that have been heated by the direct sunlight need to be moistened with water to cool them down.
To increase the strength of adhesion of the material to the base, it is necessary to treat the surface with one or two layers of a deep penetration primer, while uneven and highly absorbent bases should be covered in several layers.
Dust pollution of primed surfaces should be prevented. Facing is carried out only after the primed base is completely dried through.
In the room where the works are carried out, draughts and direct sunlight should be avoided. Gypsum bases should be completely dry (with maximum residual moisture content of 0.5%), sufficiently solid, and dust-free.
To prepare the mortar, only clean containers, tools and water should be used.
It is forbidden to introduce any additional components to the prepared mortar.
To prepare the mortar, pour the contents of the bag into a container with clean water (0.19-0.23 L per 1 kg of dry mix) and stir for 2-4 minutes until smooth.
Let the mortar settle for 5 minutes and stir it again.
Stirring is performed mechanically using a professional mixer or an electric drill with a mixing paddle.
Manual mixing is allowed when the weight of mix to be added to water does not exceed 1 kg.
;The adhesive mixture is applied to the base using a notched trowel with tooth size not less than 8 mm.
The trowel should be selected in such a way so that, for interior walls and floors with light load, 65-70% of the back side of the tile could be covered with adhesive, and for surfaces with heavy load or when laying the tiles outdoors, 100% of the tile could be covered.
To ensure high adhesion, a thin layer is first applied to the base with the smooth side of the trowel.
Immediately after this, a layer with the required thickness is applied using an appropriate notched trowel, depending on the type and size of the tile.
For exterior floor and wall cladding, the adhesive is applied to both the base and the back side of the cladding material (double application) to ensure its installation without hollows.
If the back side of the cladding material is thickly covered with dust, it is recommended to moisten this side with water.
For best adhesion, the facing material needs to be installed with some pressure applied.
Under normal temperatureand humidity conditions, the open time is about 25 minutes.
Unfavorable weather conditions
-
bright sunlight
-
dry wind
-
high temperature, etc.
-
or a highly absorbent base
During the first 24 hours, it is forbidden to wash the installed cladding material or leave it in the rain, and it is also necessary to protect it from freezing and bright sunlight for 7 days.
;The position of the tiles can be adjusted within the first 20 minutes.
Tile grout is applied after 24 hours
when facing floors (with a 6x6 mm trowel), after 8 hours when facing walls (with a 3x3 mm trowel).
When facing floors (with a 6x6 mm trowel), walking on tiles is possible 24 hours after laying.
Underfloor heating can be used not earlier than 28 days after cladding. There must be no hollows in the adhesive layer under the tiles. Expansion joints must be filled with appropriate sealants. For spot bonding of sound-proof or heat-insulating panels, the adhesive mixture should be applied in single spots or with a trowel.
If there is a strong dustiness on the back side of the facing material , it is recommended to moisten this side.
For the best adhesion, the lining material must be laid with pressure.
At normal temperature and humidity, the open time is about 25 minutes.
Unfavorable climatic conditions
-
bright sun
-
dry wind
-
high temperatures, etc
-
or a highly absorbent base
The glued facing material is not allowed to be washed or left in the rain for the first day, and it is also necessary to protect it from freezing and strong sun for 7 days.
The tile position can be adjusted within 20 minutes.
Grout - after 24 hours
when facing floors (with a 6x6 mm spatula), after 8 hours when facing walls (with a 3x3 mm spatula).
When facing floors (with a 6x6 mm spatula), walking is possible 24 hours after laying the tiles.
Operation of the "Underfloor heating" - not earlier than 28 days after facing. The presence of voids in the glue layer under the tile is not allowed. Expansion joints should be filled with appropriate sealants. For spot gluing of sound-proof or heat-insulating panels, the adhesive mixture is applied point-by-point or with a spatula.
Mix characteristics | Value | |
Color | gray (color variations are possible) | |
Work performance temperature |
from +5ºС to +30ºС |
|
Water amount |
per 25 kg of dry mix – 4.75 - 5.75 L |
|
Layer thickness |
2-10 mm |
|
Consumption at a layer of 1 mm |
1.1 - 1.25 kg/m² |
|
Mortar working life |
NLT 4 hours |
|
Tile laying time |
25 min |
|
Adjustment time for tiles with water absorption less than 0.5% |
60 min |
|
Time before walking (6x6 mm trowel) |
NLT 24 hours |
|
Adhesion strength in the air-dry environment |
NLT 1.5 MPa |
|
Adhesion strength in the water environment |
NLT 1 MPa |
|
Adhesion strength after cyclic freezing-thawing |
NLT 1 MPa |
|
Operating temperature |
from -60ºС to +120ºС |
You can select and send the order to the points of sale closest to you.
Important! partner prices differ from those indicated on the site.
When ordering directly from us, the products will be shipped from the central warehouse in Samara.
Market "STROYDOM"
Samara
Market "Samodelkin"
Samara
Market "at the bird"
Samara
Market "On Elizarova"
Samara
LLC "Stroymash"
Samara
"PKF" Flag Stone Art "
Samara
LLC "Nick"
Samara
LLC "square meters"
Samara
Ltd. "Ekogips"
Samara
Shipping options:
Maritime cargo shipping
Containers, Barge
Rail freight shipping
Container, Covered railroad car, Gondola car, Covered hopper
Road shipping
Containers, Trucks, Bulk cement trucks
PEC
Shipping of small loads (Bag, Pallet of gypsum plaster) by a transport company
Pick-up
Any transport or logistics company of your choice.
Payment options:
Cashless settlement
bank transfer - any method of invoice payment
Cash settlement
in a retail store - by pick-up (only for individuals)
If you are ready to purchase more than 10 tons at once, when contacting us via the feedback form or by calling the phone number8 800 500 70 63 you are assigned a personal manager who will develop a personalized profitable quotation for you!
Bulk order placement process:
Request
Send us an email with a request for product delivery
Quotation
You will receive a quotation with the maximum discount by email
Confirmation
Confirm the order, and we will promptly transfer it to processing
Payment
Mutual approval of the terms and conditions of sale and delivery
Order picking
We promptly pick your order
Shipping
We ship the cargo according to the agreed delivery method
Also buy
Make order
You can see detailed information on the page terms of partnership agreements .
It is interesting and profitable to work with us!